Project REDCap
1) Introductory Overviews
2) Basic Features & Functionality
- Introduction to Instrument Development (6 min)
- Overview of Basic Data Entry (19 min)
- Applications Overview (16 min)
3) Project Types
- Overview of Project Types (3 min)
- Traditional Project (3 min)
- Single Survey Project (5 min)
- Longitudinal Project (3 min)
- Longitudinal + Scheduling Project (3 min)
- Operations Project (2 min)
4) Special Topics
- REDCap Mobile App (2 min)
- Project Field Types (4 min)
- The Calendar (7 min)
- Data Access Groups for Multi-site Projects (7 min)
- Data Resolution Workflow – Data Queries Module (5 min)
- Locking Records (2 min)
- Defining Longitudinal Events (5 min)
- Designating Instruments for Events (3 min)
- Scheduling Module (7 min)
- Repeating Instruments and Events (33 min)